Sentinel Marine

14 April 2014

Tank Testing

Tank testing of Sentinel Marine’s new 62m Multi Role ERRV has now completed. The scaled model can been seen attached to an electrical resistance dynamometer on-board the towing carriage which allows records of tank temperature, carriage speed and model resistance to be measured. From the observed wave patterns and resistance results, this hull design indicates a very good performance both for crew comfort as well as fuel efficiency. The 4 + 4 build series is on target to complete construction and enter service in the North Sea during 2015.


WORK WITH US.

We are always seeking talented and passionate individuals to further strengthen our team.